In the cooler months ahead, the following improvements will be made to the Claremont Aquatic Centre:
Bore renewal
A new bore is being drilled which is used to water the gardens.
Renewing the bore will provide a cost-effective water source and contribute to sustainable water management.
Works completed.
Grass works
The main grass area, worn and weedy areas will be replaced with new lush turf.
Works completed.
Chemical system changeover to salt chlorinator
We are transitioning to a salt chlorination system for pool sanitisation, which offers enhanced safety and greater cost-effectiveness compared to our current method.
This change will not only improve the overall maintenance of the pool but also provide a more sustainable solution for ensuring water quality.
The salt chlorinator will reduce the need for harsh chemicals, offering a safer environment for pool users while also lowering long-term operational costs.
Estimated start date: 28 April 2025
Estimated duration: 2 months
Impact: This should have no impact on patrons other than a possible day of closure.